Solar on a diesel-backed site only saves money if the two are coordinated — uncontrolled PV trips generators, and cautious PV wastes panels. HoneyCore 4.0 runs them as one power plant, from €20 per site/month.
Discuss My Hybrid SiteMidday sun pushes power INTO the genset — nuisance trips at best, a damaged alternator at worst. The controller caps PV so it never happens.
A genset idling under 30% load glazes its cylinders. HoneyCore keeps each machine above its floor or shuts it down cleanly.
The safe-but-dumb fix is curtailing solar hard. Coordinated control curtails only when physics requires it — the fuel saving is the difference.
Fuel consumption and PV contribution are metered and logged — savings are a report, not a brochure claim.
Start/stop events, loading profiles and maintenance-relevant hours per machine.
The controller and commissioning are fixed, transparent costs (hardware by proposal + €500 standard) — set them against the logged saving.
The same controller grows into storage and grid coordination — all five hybrid configurations on the Hybrid Control page. Pricing is capacity-neutral: per site, never per kWp.
Send the basics — the assessment comes back with the control concept and honest numbers.